Request for Quote Letter
Asks a tradesperson or supplier for a written quote you can compare.
Details
request for quote letterUploads
Your logo
A photo or picture
Goes on this page only. Drag it anywhere and pull its corner to resize it.
Your signature
Draw it with a finger, a mouse or a trackpad, and it goes on the page like a picture.
Pictures and signatures stay on this device. Nothing is uploaded to a server.
Red highlights mark what is still blank. Click anything on the page to change it. Your draft is kept on this device as you work.
Dear Sir / Madam,
I would like a written quote for [the work] at [address].
Please could the quote separate labour from materials, say what is excluded, and confirm how long the price holds.
I would be grateful for the quote by [date]. I am getting more than one, so a clear breakdown genuinely helps.
What is a Request for a Quote?
A request for a quote asks a tradesperson or supplier to price a defined job in writing, on terms you can set beside another firm's price. It matters because a verbal number is neither comparable nor enforceable. When three builders quote against the same written scope, you are comparing prices; when they quote against a conversation, you are comparing three different jobs and usually choosing the one that left the most out.
Householders use it for building work, rewiring, boiler replacement, roofing, removals, driveways, catering and vehicle repairs. Landlords and managing agents use it for maintenance contracts, and small businesses and committees for printing, cleaning, IT support, insurance renewals and event suppliers. Residents' associations and clubs send it to several firms at once so a committee can compare like with like. The same letter works whether the reply comes back as a formal quotation on letterhead or as a priced email.
A quote and an estimate are treated differently, and how strongly a quote binds a trader depends on local consumer law. The Consumer Rights Act and the consumer contracts regulations apply in the United Kingdom, including cancellation rights for contracts agreed in your home; the EU consumer rights directive gives an equivalent withdrawal right; Australian Consumer Law adds consumer guarantees; Canadian provinces and many US states regulate home improvement contracts and trade licensing directly; India applies the Consumer Protection Act. Check the cancellation period and any licensing requirement that applies where the work will be done.
Asking for a quote commits you to nothing, and receiving one does not create a contract — that happens when you accept it, in the manner the quote says it may be accepted. A quote does not fix the price against changes you later ask for, which is why the variations clause matters more than the headline figure. And the letter verifies nothing about the firm: licences, registration, public liability insurance and references are separate checks to make before you accept, not after.
What to put in a Request for a Quote
These are the details this template asks for. Anything left blank is marked in red on the preview so you can see what is still missing.
| Field | What goes in it |
|---|---|
| Issuing organisation | For example: Maple Grove Homeowners Association |
| Organisation address | For example: 1420 Kinnear Road, Columbus, OH 43212 |
| Home address | For example: 588 Kinnear Road |
| The work | For example: replacing the fence along the back boundary, about 18 metres |
| What is involved optional | One per line |
| Access optional | For example: Side gate takes a wheelbarrow but not a van. Someone is home most weekdays. |
| Quote wanted by | Free text |
| Issued to (full name) | For example: James Whitfield |
| Their address | For example: 588 Kinnear Road, Columbus, OH 43212 |
How to write a Request for a Quote
Describe the job in measurable terms
Give dimensions, quantities, materials and locations. Replace the fence along the rear boundary, twenty-two metres, closeboard, concrete posts, existing fence removed and taken away prices very differently from replace the back fence. Attach photographs, a sketch with measurements, a floor plan or a model number. Where you do not know the specification, say so and ask the supplier to state the assumption they have priced.
State what the supplier must include
Ask for a breakdown rather than a single figure: labour, materials, plant hire, waste removal, permits, delivery and tax. Say whether the price should include or exclude tax, and state the currency. Ask what is excluded — that line reveals more than the total does. Ask for the start date, working days needed, payment stages, and the guarantee period on labour and materials.
Set the deadline and validity period
Give a date by which you need the quote and say how long you need the price held: returned by the twentieth, held open for thirty days. Without a validity period, a price you compare in March gets renegotiated in May. Say how you want it returned, and confirm you are comparing several quotes so nobody assumes the job is already theirs.
Ask for licences, insurance and references
Ask for the trading name and registered address, the registration or licence number where the trade is regulated, proof of public liability insurance with its expiry date, and two recent references for similar work. Ask whether the firm subcontracts any part of the job and to whom. Check all of this before you accept, since a low quote from an uninsured firm is not a saving.
Send identical wording to every firm
Send the same scope, the same inclusions and the same deadline to each firm, and keep a copy of what you sent. Changing the description between suppliers destroys the comparison and produces a spread of prices you cannot explain. When the quotes return, compare the exclusions and the payment terms first and the totals second — the cheapest quote is often the one with the most left out.
Common mistakes
- Describing the job in words rather than measurements, which gets you three prices for three different jobs and no real basis for choosing.
- Accepting a single lump sum with no breakdown, so a later argument about what was included has nothing to be settled against.
- Omitting a validity period, which lets a firm reprice after you have already turned down the alternatives.
- Failing to ask what is excluded, then discovering waste removal, making good and permits are extras once the work has started.
- Paying a large deposit against a quote that names no payment stages, leaving you with no leverage if the work stalls halfway.
Frequently asked questions
What is the difference between a quote and an estimate?
A quote is a firm price for a defined scope; an estimate is a considered figure that can move. The difference matters in a dispute, so ask suppliers to label which they are giving and to state what would cause the number to change. How strongly a quote binds the trader is a matter of the consumer contract law where the work is done.
How do I ask a builder for a quote?
Write the job down in measurable terms, attach photographs or a sketch, and ask for a written quote broken into labour, materials, waste removal and tax, with exclusions listed, a start date, payment stages and a guarantee period. Give a return date and a validity period, and say you are comparing several quotes for the same scope.
How many quotes should I get?
Three is the usual working number for domestic work — enough to show whether an outlier is genuinely cheap or simply incomplete, without a month of site visits. For larger or specialised jobs, more may be worthwhile. Committees and associations often have a rule in their own bye-laws requiring a minimum number above a stated value, so check that first.
Is a quote legally binding?
It generally binds once you accept it in the way the quote allows, creating a contract on those terms — but the detail depends on the consumer or commercial law that applies, and on whether the document is a quote or an estimate. Cancellation rights may also apply to contracts agreed in your home. Check the position locally before you sign.
Should I pay a deposit before work starts?
Deposits for materials are normal; large upfront payments for labour are not. Ask for payment stages tied to completed milestones, hold a retention until snagging is done, and pay by a traceable method. Check what protection applies to deposits where you live, since some consumer schemes and card payment rules give a recovery route and cash gives none.
This page explains general practice and is not legal advice. Requirements differ between countries and, in some cases, between states — check what applies where the document will be used.